Venture in formation · Built on doctoral research at IIT Bombay
Turning waste to wealth with engineered microbes
We are developing microbial bioprocesses that recover rare earth elements from coal fly ash with less acid, and lock CO₂ into the leftover residue.
Why coal ash, and why now
India produces coal ash at enormous scale and needs secure supplies of rare earths for magnets, electronics and clean energy. Recovering those metals from ash today usually takes strong mineral acids and high heat. We are developing a microbial route that uses less acid and leaves behind a residue that can store CO₂.
of coal ash is produced by India's thermal power plants every year. It goes mainly into cement, bricks, roads and fill, and the critical metals inside it are not recovered.
of rare earth elements has been measured in Indian fly ash (Neyveli), with around 400 ppm in samples from other plants.
is set aside under India's National Critical Mineral Mission for pilot projects that recover critical minerals from fly ash, red mud, tailings and overburden.
How it works
Four steps take coal ash from waste to recovered rare earths, with CO₂ locked into what is left over.
STEP 1
Pretreatment & Activation
Desilication, alkali roasting or flash Joule heating expose the REE-bearing phases.
Learn moreSTEP 2
Bioleaching
Acid-producing and redox-active microbes dissolve the critical metals.
Learn moreSTEP 3
Precipitation & Recovery
REEs are selectively recovered as oxalates or phosphates for refining.
Learn moreSTEP 4
CO₂ Sequestration
The carbonated residue locks CO₂ away as stable minerals.
Learn moreImpact metrics
70%
REE recovery in bench-scale bioleaching
Lab result−40%
Mineral acid use vs. conventional acid leaching
Pilot target>80%
Process water recycled
Pilot target250 kg/t
CO₂ locked per tonne of ash
EstimateLab results come from bench-scale trials at IIT Bombay (2025). Pilot targets are design goals and estimates are calculations; both will be replaced with measured values as the pilot runs.
Interactive technology sandbox
Move the sliders to see how pH, pulp density and time trade off against each other in bioleaching.
Bioleaching simulator
Illustrative model, not experimental dataSolid-to-liquid ratio in the leach.
Acid strength, which controls how readily REEs dissolve.
How long the microbes work on the ash.
Modelled REE recovery
kg acid / t ash
Acid strength
Lower pH dissolves REEs faster but uses more acid. The aim is the mildest pH that still gives good recovery.
Pulp density
Denser slurries treat more ash per batch and use less acid per tonne, but slow down diffusion and lower the final yield.
Roadmap
Phase 1 — Sample collection & characterisation
Dec 2024 – Apr 2025
Collection of coal fly ash, bottom ash and acid mine drainage samples from major thermal power plants and coalfields, followed by mineralogical, geochemical and microbial characterisation.
Phase 2 — Bioleaching optimisation
May 2025 – Oct 2025
Isolation of indigenous microbes and optimisation of REE bioleaching parameters using both direct and indirect approaches.
Phase 3 — Genetic engineering & consortia development
Nov 2025 – Apr 2026
Enhancing acid production and metal mobilisation through genetic modification and microbial consortium design.
Phase 4 — Pilot-scale testing & techno-economic evaluation
May 2026 – 2027
Pilot-scale bioleaching and recovery of REEs from coal-based waste, integrated with CO₂ sequestration and a cost–benefit analysis.
Let's work together
We're looking for power utilities and ash-pond owners for pilot sites, industry partners for scale-up, and investors who back deep-tech climate ventures. Researchers are welcome too.
- ✉️ contact@w2wenergene.com
- 📞 +91-9511444574
- 📍 IIT Bombay, Powai, Mumbai